涂料工业 ›› 2015, Vol. 45 ›› Issue (3): 73-76.

• 涂装技术 • 上一篇    下一篇

挖掘机结构件预涂工艺研究

蒋伟洁1, 彭顺金1,徐 杰2,王振东2,顾广新2,李梦君3,赵 宏3   

  1. 1、武汉科技大学,武汉 430065;2、复旦大学,上海 2000433;3. 徐州工程机械集团有限公司,江苏徐州 221004
  • 出版日期:2015-03-31 发布日期:2019-05-31

Precoating Process for Structural Parts of Excavator

Jiang Weijie1, Peng Shunjin1, Xu Jie2, Wang Zhengdong2, Gu Guangxin2, Li Menjlun3, Zhao Hong3   

  1. 1. Wuhan University of Science and Technology, Wuhan 430065, China; 2. Fudan University,Shanghai 200433, China; 3. Xuzhou Construction Machinery Group, Xuzhou, Jiangsu 221004,China
  • Online:2015-03-31 Published:2019-05-31

摘要: 采用在挖掘机结构件底漆喷涂前增加预涂工艺的方法,有效地解决了复杂结构件的涂装防腐问题,底漆喷涂的效率大大提高,并降低了涂料消耗量。

关键词: 挖掘机, 结构件, 预涂, 腐蚀

Abstract: In this paper, the precoating process is used before the primer spraying process, which effectively solves the corrosion control of structural parts The result shows that the spraying efficiency is improved and the coating consumption is reduced.

Key words: excavator, structural part, precoating, corrosion